|
This
$2 million project included design and construction
phase engineering of an eight-bay booster pump
facility to serve two separate pressure zones
north of the Rocky Mountain Arsenal National Wildlife
Refuge.
The
pump station features five variable frequency
drives, controls and SCADA, a loading area with
overhead electrical hoist and a back-up 750 KVA
generator. The booster pumps are housed in a 15-foot
deep basement to allow future pumping from a planned
buried reservoir.
|