Brantner Gulch at Riverdale Regional Park
Brighton, Colorado
Muller is supporting the Mile High Flood Control District with ongoing design efforts for Brantner Gulch and its tributaries, located within the Riverdale Dunes golf course and adjacent public infrastructure. The project addresses drainage improvements associated with Brantner Gulch and Tributary 6, and includes design elements that integrate with golf course features, irrigation systems, and existing utility corridors.
Muller’s responsibilities include advancing the channel layout and design, completing structural design for the Brantner Ditch and Park Boulevard culvert crossings, and preparing final design plans for storm sewer, waterline, and sanitary sewer relocations. Additional tasks include hydraulic analysis, floodplain evaluation, final roadway design, and coordination with multiple stakeholders. Supporting design services also include coordination of survey and subsurface utility investigations, golf course architectural input, and irrigation system modifications necessary for both temporary and permanent conditions. The project received a DRCOG Metro Vision Award.Â
OWNER
Adams County
Mile High Flood District
SERVICES
Stormwater & Floodplain Management
Structural & Bridge Design
EXTERNAL lINK
AWARDS
2026 DRCOG Metro Vision Award
Statistics
3 Bridge Hydraulic Designs and Scour Mitigations | 2 Pedestrian Bridges | 1 Roadway Bridge | 3 Concrete Box Culverts | 256 feet of Concrete Box Culvert | 1 Detention Pond | 19 Grade Control Structures | 1 Non-Traditional Intersection Design | 1 Parking Lot with 285 Parking Spaces | 0.2 miles of Resurfaced Roadway | 0.3 miles of Urban Roadway | 1,900 feet of New Sanitary Sewer Line | 596 feet of Storm Drain (48-inch and larger) | 1,439 feet of Storm Drain (All Sizes) | 1 Major Storm Drain Outfall | 1 mile of Stream Restoration | 2 Structures Inspected | 0.6 miles of Trails | 0.3 miles of Transit Lanes | 2,395 feet of Water Lines