SMOKY HILL ROAD CORRIDOR STUDY
Centennial, Colorado
Muller performed a transportation study of Smoky Hill Road between Buckley Road and Versailles Parkway. The existing roadway is a four-lane arterial northwest of Buckley Road. The key purpose of this study was to evaluate the corridor to consider future widening from a four-lane to a six-lane arterial without significant changes to the existing right-of-way (ROW) limits. The extent of the study area is approximately 2.8 miles along Smoky Hill Road within the City of Centennial city limits from Buckley Road on the north to Liverpool Street on the south. Another section to be included within the study lies outside of Centennial’s city limits, from Liverpool to Versailles Parkway. Both travel directions were included in the corridor study. The results of the study included a prioritized list of improvements, concept plan, and construction cost estimates.
OWNER
City of Centennial
SERVICES
Traffic Engineering & ITS
Transportation Planning & Design
Program Management
Environmental
EXTERNAL LINKS
Statistics
2.8 Miles of Bike Lane Conceptual Design | 2.8 Miles of Urban Roadway Corridor Planning Length | 8 Intersection Designs | 8 Planning Intersections