Audrey L. Rogers, PE
Associate | Senior Project Manager, Stormwater
Employee since 2010
Shareholder since 2022
Audrey serves as a senior project manager and team lead in the Stormwater group, responsible for all aspects of stormwater design. Her experience is in the design and management of projects involving stormwater drainage engineering, including hydrologic and hydraulic modeling of conduits, storm sewer, channels, and detention ponds, as well as floodplain studies.
Audrey’s career began in land development where she gained experience in a diverse range of design. At Muller her experience has been more focused on stormwater design. This includes construction cost estimating, preparing plans and specifications, and proposal preparation with engineering fee estimating.
Audrey is the project manager on the East 16th Avenue Storm Sewer Interceptor project for the City and County of Denver. She has worked with a variety of clients, including Mile High Flood District, CDOT, and many municipalities throughout the Front Range. She leads Muller’s Internal Engagement team and participates on many other committees within the organization.
Audrey is a member of the Colorado Association of Stormwater and Floodplain Managers. She is a professional engineer in Colorado.
Areas of Expertise
- Hydrologic and Hydraulic Analysis and Design
- Floodplain Evaluations
- Stream Restoration
- Open Channel Design
- Detention & Water Quality Facility Design
- Large Conduit Design